Pack 2: Advanced Mould Removal Kits
Key Features
- GENUINE V-TUF PACK 2 ADVANCED MOULD REMOVER KIT – mid-tier mould remediation for social housing
- FOR ESTABLISHED MOULD GROWTH – enhanced tools and removal products
- INCLUDES ENHANCED PPE – plus extended remediation consumables
- PAIR WITH H-CLASS EXTRACTION – use alongside RUCKVAC HSV or MIDI HSV for full compliance
- GENUINE V-TUF KIT – 1-year warranty, supplied from our Lincoln warehouse
Customise with optional extras:
Description
A complete mould remediation kit — designed for compliant cleaning under Awaab's Law and COSHH.
Pack 2: Advanced Mould Remover Kit (MSP004) is the mid-tier mould remediation kit for social housing maintenance contractors, providing enhanced tools and removal products for more established mould growth in occupied and void social housing properties.
For: Social housing maintenance contractors, local authority DLO teams, and housing association operatives dealing with more significant mould growth requiring advanced removal.
What's included:
- Advanced mould removal products
- Enhanced PPE for operatives
- Extended remediation consumables
Important: Mould remediation in social housing requires H-Class dust extraction for disturbed mould — see the RUCKVAC HSV or MIDI HSV range. This kit provides the chemical treatment layer alongside H-Class vacuum extraction.
1-year manufacturer's warranty. Genuine V-TUF, supplied from our Lincoln warehouse.
Where this kit is used
Legislation that applies
Awaab's Law (Social Housing Regulation Act 2023) — Social landlords must investigate within 14 days, begin emergency repairs within 24 hours where there is immediate health risk, and complete remediation within 7 days. Written records required.
COSHH Regulations 2002 — Mould spores are biological agents under COSHH. H-Class extraction mandatory where mould is disturbed. PPE mandatory throughout remediation.
Renting Homes (Wales) Act 2016 — Continuous fitness standard requires freedom from damp, mould and condensation in all rented Welsh properties.
Further reading
Awaab's Law: what it means for social housing maintenance contractors →
Damp and mould in void properties: H-Class extraction and the correct remediation standard →
Communal area cleaning in high-rise social housing →
Renting Homes (Wales) Act: what maintenance contractors need to know →
Support: Find parts for your machine →
Troubleshooting guides →
Or call our Lincoln service team on 01522 787978.
Specifications
- Warranty
- 12 Months
- Powered by
- 240V Mains
- Chemical application
- ✕
- Total stop system
- ✕
- Weight
- 20kg
- Power cable length
- 8.5m
- Sound level db a
- 58 dB(A)
- Filtration class
- H-Class